Wannigan/Cooler Build

Forum for people who are new to woodworking. Feel free to ask questions or contribute.

Moderator: admin

User avatar
algale
Platinum Member
Posts: 4841
Joined: Thu Nov 04, 2010 8:13 am

Re: Wannigan/Cooler Build

Post by algale »

7 AM 8/15 (total elapsed time 64 hours 15 minutes). Still going strong. Internal thermometer 32 (as explained by Dusty and JPG it should stay there until the ice is gone). Overnight low temperature was 68 degrees.
IMG_52DAF07CA3AC-1.jpeg
IMG_52DAF07CA3AC-1.jpeg (1.61 MiB) Viewed 19155 times
Last edited by algale on Wed Aug 15, 2018 6:53 pm, edited 2 times in total.
Gale's Law: The bigger the woodworking project, the less the mistakes show in any photo taken far enough away to show the entire project!

User avatar
dusty
Platinum Member
Posts: 21530
Joined: Wed Nov 22, 2006 6:52 am
Location: Tucson (Wildcat Country), Arizona

Re: Wannigan/Cooler Build

Post by dusty »

I have never timed the departure of ice from either of my two coolers but I do believe I would have had nothing but water long ago.
"Making Sawdust Safely"
Dusty
Sent from my Dell XPS using Firefox.
User avatar
reible
Platinum Member
Posts: 11283
Joined: Thu Jul 20, 2006 12:08 pm
Location: Aurora, IL

Re: Wannigan/Cooler Build

Post by reible »

Are you draining the water off or leaving it?

I was thinking a calculation on ice melt might be interesting. Weigh the ice that goes in and the water that comes off like every 6 hours would show a good indication of ice loss over time.

Sounds like a science project to me.

Ed
{Knight of the Shopsmith} [Hero's don't wear capes, they wear dog tags]
User avatar
algale
Platinum Member
Posts: 4841
Joined: Thu Nov 04, 2010 8:13 am

Re: Wannigan/Cooler Build

Post by algale »

reible wrote:Are you draining the water off or leaving it?

I was thinking a calculation on ice melt might be interesting. Weigh the ice that goes in and the water that comes off like every 6 hours would show a good indication of ice loss over time.

Sounds like a science project to me.

Ed
Leaving it. For what it's worth, the Yeti website has a page on ice management that recommends against draining off the melted water.
Gale's Law: The bigger the woodworking project, the less the mistakes show in any photo taken far enough away to show the entire project!

User avatar
algale
Platinum Member
Posts: 4841
Joined: Thu Nov 04, 2010 8:13 am

Re: Wannigan/Cooler Build

Post by algale »

6:45 PM 8/15. Total elapsed time: 76 hours. Still 32 on the inside thermometer. Today's high temperature was 89 degrees.

The melt rate appears to be picking up pace but the beer is sill perfectly chilled! :)
IMG_3CD2C4A4BEAF-1.jpeg
IMG_3CD2C4A4BEAF-1.jpeg (1.42 MiB) Viewed 19107 times
Last edited by algale on Wed Aug 15, 2018 6:52 pm, edited 2 times in total.
Gale's Law: The bigger the woodworking project, the less the mistakes show in any photo taken far enough away to show the entire project!

User avatar
jsburger
Platinum Member
Posts: 6585
Joined: Fri Jul 21, 2006 4:06 pm
Location: Hooper, UT

Re: Wannigan/Cooler Build

Post by jsburger »

algale wrote:6:45 PM 8/15. Total elapsed time: 64 hours. Still 32 on the inside thermometer. Today's high temperature was 89 degrees.

The melt rate appears to be picking up pace but the beer is sill perfectly chilled! :)

IMG_3CD2C4A4BEAF-1.jpeg
You are approaching 3 days. Very impressive!!!
John & Mary Burger
Eagle's Lair Woodshop
Hooper, UT
User avatar
algale
Platinum Member
Posts: 4841
Joined: Thu Nov 04, 2010 8:13 am

Re: Wannigan/Cooler Build

Post by algale »

Error in my calculation. It's 76 hours -- more than three days. Correction made in post above.
Gale's Law: The bigger the woodworking project, the less the mistakes show in any photo taken far enough away to show the entire project!

User avatar
BuckeyeDennis
Platinum Member
Posts: 3814
Joined: Tue Jul 24, 2012 10:03 pm
Location: Central Ohio

Re: Wannigan/Cooler Build

Post by BuckeyeDennis »

The beers seem to be dwindling! Will they even outlast the ice? :eek:
User avatar
algale
Platinum Member
Posts: 4841
Joined: Thu Nov 04, 2010 8:13 am

Re: Wannigan/Cooler Build

Post by algale »

BuckeyeDennis wrote:The beers seem to be dwindling! Will they even outlast the ice? :eek:
Those beers are evaporating. ;)
Gale's Law: The bigger the woodworking project, the less the mistakes show in any photo taken far enough away to show the entire project!

User avatar
JPG
Platinum Member
Posts: 35600
Joined: Wed Dec 10, 2008 7:42 pm
Location: Lexington, Ky (TAMECAT territory)

Re: Wannigan/Cooler Build

Post by JPG »

The water is likely near 32 and does not change when it is opened(hence the do not drain advice).

It should stay near 32 until almost the last chunk of ice is melted.

That last chuck will melt quite quickly I predict. The available 'heat of fusion' will diminish quickly with the decreasing mass.
╔═══╗
╟JPG ╢
╚═══╝

Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10
E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
Post Reply