Washer Dryer Gap Bridge Shelf.

Forum for people who are new to woodworking. Feel free to ask questions or contribute.

Moderator: admin

User avatar
fredsheldon
Platinum Member
Posts: 1175
Joined: Tue Jan 17, 2012 1:31 pm
Location: The Woodlands, Texas

Post by fredsheldon »

JPG40504 wrote:Y'all are ignoring the original 'need'.

Lack of a back upward projection that previously prevented 'stuff' from falling into the 'grand canyon' behind the machines.

Wall mounted cabinets will not prevent 'the original problem'.
Unless the space between the bottom of the cabinets and the top of the units is only 1/2 inch or so, then it would require the use of the cabinets instead of the top of the machine to lay stuff. :)
Fred Sheldon
The Woodlands, Tx
'52 10ER # 60869 (restored in 2012, used as a dedicated drill press), '52 10ER # 88712 (restored 01/2013), 52 10ER # 71368 (in process of restoring), '83 500 Shorty with OPR installed, '83 520 PowerPro with Lift Assist, 6" Joiner, 6" Belt Sander, 18" Jig Saw, 11" Band Saw, 12" ProPlaner, SS Crosscut Table. SS Dust Collector, Hitachi 1/2" router, Work Sharp 3000 with all attachement, Nova G3 Chuck, Universal Tool Rest, Appalachia Tool Works Sled.
Post Reply