Horseshoe project loaded on truck
It was a long day today but the project is loaded in the truck and scheduled for installation Tuesday. I will get some good shots after it is cleaned and the counter top is installed. The top is being done by another shop and I don't even know the color but it is not black.
Thanks for following along.
Mark
Thanks for following along.
Mark
- JPG
- Platinum Member
- Posts: 35457
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
THANKS for something to FOLLOW!!!!!!:)mbcabinetmaker wrote:It was a long day today but the project is loaded in the truck and scheduled for installation Tuesday. I will get some good shots after it is cleaned and the counter top is installed. The top is being done by another shop and I don't even know the color but it is not black.
Thanks for following along.
Mark
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
-
- Platinum Member
- Posts: 1627
- Joined: Thu Jul 20, 2006 6:18 am
- Location: Greer SC
Update
Scheduled for installation on the 26th of May I was backed up to the job sight at 8:00 AM. The contractor had pushed for this installation date and here I am starring at a swimming pool in the vestibule where it was to go. Now I remember why I hate commercial jobs!
That was last week so today I was finally able to install after they got the windows set in the building and the ceramic tile down.
[ATTACH]4828[/ATTACH]
The flat area in the center will have some type of logo installed.
[ATTACH]4829[/ATTACH]
[ATTACH]4830[/ATTACH]
See it does look like a horseshoe.
We were taking our time and cleaning everything as it went together. It was looking good until the sheetrock finishers came in and started sanding the 20 foot wall above it. Oh well they can clean it again. I am finished, the GC will install the panels we left off for the electricians.
Mark
That was last week so today I was finally able to install after they got the windows set in the building and the ceramic tile down.
[ATTACH]4828[/ATTACH]
The flat area in the center will have some type of logo installed.
[ATTACH]4829[/ATTACH]
[ATTACH]4830[/ATTACH]
See it does look like a horseshoe.
We were taking our time and cleaning everything as it went together. It was looking good until the sheetrock finishers came in and started sanding the 20 foot wall above it. Oh well they can clean it again. I am finished, the GC will install the panels we left off for the electricians.
Mark
- Attachments
-
- P1010255.jpg (99.42 KiB) Viewed 3239 times
-
- P1010256.jpg (102.48 KiB) Viewed 3239 times
-
- P1010254.jpg (108.75 KiB) Viewed 3240 times
- dusty
- Platinum Member
- Posts: 21481
- Joined: Wed Nov 22, 2006 6:52 am
- Location: Tucson (Wildcat Country), Arizona
The Horseshoe Project
looks great and it was a terrific learning experience. I have always been intrigued by curved wooden surfaces. Now I have a greater appreciation for what goes into one to get that look.
I sure hope the architect and the interior designer were in tune with one another when they chose the paint and carpet colors. That black counter is striking; it'll be even more so with the right supporting colors.
I sure hope the architect and the interior designer were in tune with one another when they chose the paint and carpet colors. That black counter is striking; it'll be even more so with the right supporting colors.
"Making Sawdust Safely"
Dusty
Sent from my Dell XPS using Firefox.
Dusty
Sent from my Dell XPS using Firefox.
It's GREAT LOOKING. You do FINE work and on time. To bad the GC was knot on time to.
SS 500(09/1980), DC3300, jointer, bandsaw, belt sander, Strip Sander, drum sanders,molder, dado, biscuit joiner, universal lathe tool rest, Oneway talon chuck, router bits & chucks and a De Walt 735 planer,a #5,#6, block planes. ALL in a 100 square foot shop.
.
.