Yes, but "one bite at a time" is how I'm going to do this - you wouldn't believe how hard it is to find lead for sale.JPG40504 wrote:Given any thought to filling both the bench and the way tubes?
Lead filled bench tubes?
Moderator: admin
- jcraigie
- Platinum Member
- Posts: 505
- Joined: Sun Sep 05, 2010 8:17 pm
- Location: Fowlerville, Michigan
I'm looking into this also I'll probably go with whichever is better on the walletderekdarling wrote:... OR..., you could just use solid steel tubes. Not as heavy, but certainly rigid. Now, to get them... that's the rub!
Derek
1984 Mark V 500 and an early 1954 greenie. jointer, belt sander, bandsaw, jigsaw, planner.
Jeff
Jeff
- jcraigie
- Platinum Member
- Posts: 505
- Joined: Sun Sep 05, 2010 8:17 pm
- Location: Fowlerville, Michigan
Found a place to get it, it's a guy who cleans firing ranges - 25# for $25reible wrote: The bad news normal comes when you get to the cost. The lead shot of old has been gone for a while, the new shot is wildlife save and costs more.
1984 Mark V 500 and an early 1954 greenie. jointer, belt sander, bandsaw, jigsaw, planner.
Jeff
Jeff
- jcraigie
- Platinum Member
- Posts: 505
- Joined: Sun Sep 05, 2010 8:17 pm
- Location: Fowlerville, Michigan
Can you give me your math I figured closer to 110# - 125# for the bench tubes (1 7/8" greenie tubes) My math is probably wrong, I just want to check it.pennview wrote:If you work out the calculations on filling the tubes with led shot, it will take about 100 pounds to fill the four tubes. If you buy the reclaimed shot from ROTOMETALS, it will cost you about $170.00.
1984 Mark V 500 and an early 1954 greenie. jointer, belt sander, bandsaw, jigsaw, planner.
Jeff
Jeff
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
Use the "id"?(1 5/8", maybe 1 1/2")jcraigie wrote:Can you give me your math I figured closer to 110# - 125# for the bench tubes (1 7/8" greenie tubes) My math is probably wrong, I just want to check it.
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
- jcraigie
- Platinum Member
- Posts: 505
- Joined: Sun Sep 05, 2010 8:17 pm
- Location: Fowlerville, Michigan
I "rough" measured the bench tubes at 1 5/8" (ID) x 52.75"
Lead weighs .4092 lb/in3
volume of the tube = 109.40044 in3
44.76 pounds per tube for the lead if I melt and fill.
Adds 89.5 pounds for both bench tubes
I "rough" measured the way tubes at 1" (ID) x 52"
Lead weighs .4092 lb/in3
volume of the tube = 40.8407 in3
16.71 pounds per tube for the lead if I melt and fill.
Adds 33.4 pounds for both way tubes
Adds 122.9 pounds if I fill all four tubes. Not bad for weight, but that's a crap load (technical term) of lead to melt and pour.
Lead weighs .4092 lb/in3
volume of the tube = 109.40044 in3
44.76 pounds per tube for the lead if I melt and fill.
Adds 89.5 pounds for both bench tubes
I "rough" measured the way tubes at 1" (ID) x 52"
Lead weighs .4092 lb/in3
volume of the tube = 40.8407 in3
16.71 pounds per tube for the lead if I melt and fill.
Adds 33.4 pounds for both way tubes
Adds 122.9 pounds if I fill all four tubes. Not bad for weight, but that's a crap load (technical term) of lead to melt and pour.
1984 Mark V 500 and an early 1954 greenie. jointer, belt sander, bandsaw, jigsaw, planner.
Jeff
Jeff
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
jcraigie wrote:I "rough" measured the bench tubes at 1 5/8" (ID) x 52.75"
Lead weighs .4092 lb/in3
volume of the tube = 109.40044 in3
44.76 pounds per tube for the lead if I melt and fill.
Adds 89.5 pounds for both bench tubes
I "rough" measured the way tubes at 1 1/4" (ID) x 52"
Lead weighs .4092 lb/in3
volume of the tube = 63.8136 in3
26.11 pounds per tube for the lead if I melt and fill.
Adds 52.2 pounds for both way tubes
Adds 141.7 pounds if I fill all four tubes. Not bad for weight, but that's a crap load (technical term) of lead to melt and pour.
You must have 10E/ER 'way' tubes.
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
jcraigie wrote:I "rough" measured the bench tubes at 1 5/8" (ID) x 52.75"
Lead weighs .4092 lb/in3
volume of the tube = 109.40044 in3
44.76 pounds per tube for the lead if I melt and fill.
Adds 89.5 pounds for both bench tubes
I "rough" measured the way tubes at 1" (ID) x 52"
Lead weighs .4092 lb/in3
volume of the tube = 40.8407 in3
16.71 pounds per tube for the lead if I melt and fill.
Adds 33.4 pounds for both way tubes
Adds 122.9 pounds if I fill all four tubes. Not bad for weight, but that's a crap load (technical term) of lead to melt and pour.
You 'fixed' it by changing it to 1"????????????????????
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
- jcraigie
- Platinum Member
- Posts: 505
- Joined: Sun Sep 05, 2010 8:17 pm
- Location: Fowlerville, Michigan
Hey, I fixed all the figures and I did say rough. I'm measuring by proxy (12 yo son over the phone) so the measurements may not be "exact".JPG40504 wrote:You 'fixed' it by changing it to 1"????????????????????
If you can measure yours and let me know the ID I'll do the math withthe official JPG measurements.
1984 Mark V 500 and an early 1954 greenie. jointer, belt sander, bandsaw, jigsaw, planner.
Jeff
Jeff