My winter project
Moderator: admin
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
Only a 'fellow woodworker' would recognize the effort and skill required to make that from scratch.
Well done!
I hope your wife is an exception to the first statement!
Well done!
I hope your wife is an exception to the first statement!
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
Beautiful Sewing box! WoW! If you only had 50 hours into it, you must be a top notch speed merchant - and an accurate on at that!!
Looks more than several hundred hours to me. I know if I put in 4 hours/day in the shop I would be looking at 50 days. Even then, don't know if it would have such a fine looking finish!
Looks more than several hundred hours to me. I know if I put in 4 hours/day in the shop I would be looking at 50 days. Even then, don't know if it would have such a fine looking finish!
Octogenarian's have an earned right to be a curmudgeon.
Chuck in Lancaster, CA
Chuck in Lancaster, CA
-
wingman2010
- Gold Member
- Posts: 32
- Joined: Sun May 15, 2011 12:38 am
- Location: San Antonio, Texas