Page 2 of 2

Posted: Thu Jul 24, 2014 10:36 am
by JPG
Is that url spelled correctly? (404 error)

Posted: Thu Jul 24, 2014 11:21 am
by Gene Howe
Ya gotta copy and paste, then remove the : at the end.
That stuff is way above my pay grade. About $75 inc. the dispenser and nozzle.
JPG40504 wrote:Is that url spelled correctly? (404 error)

Posted: Thu Jul 24, 2014 11:24 am
by dusty

Posted: Thu Jul 24, 2014 2:35 pm
by lightnin
Thanx Doug.. in this project a 24 volt solar power plant to put out on my pier the HDPE will be a component mounting surface
with some bolts through it for terminals. I really don't need to bond plexiglass to HDPE but I know I'll have all the scrap stuff
to try it handy so it will just be a test for future reference. Plexiglass will used for three things. A hail damage shield for the PV panels.
A panel for the panel mount volt and amp meters. A window to view those meters. Before people jump in to tell me of the efficiency loss
with the plexiglass covering the PV panels I have looked into it and Like I've said before I'm a Locomotive engineer I see plexi covered
PV panels every day along the tracks. I have talked to the maintainers who say it makes very little difference.