today in the shop (parts cabinet shelf)
Posted: Fri Jul 11, 2014 7:37 pm
Today's efforts were attaching the last three pieces and then setting it up for pictures followed by moving it in the garage.
It took me two days to get to this point. No parts were cut on a shopsmith. I used an edge guide to rip (circular saw), chopsaw to cut to length, router to make the dados..........kreg jig to do the frames......
Just wanted to point out I'm still alive and still wood working. Was at Iola, WI yesterday with my two remaining brothers, we have not all been in one place at the same time in maybe 35 years so we figured it was time. And it was great! We will have to see if we can manage another outing soon.
Anyway I know things don't happen unless there are pictures.
[ATTACH]25568[/ATTACH]
[ATTACH]25569[/ATTACH]
[ATTACH]25570[/ATTACH]
[ATTACH]25571[/ATTACH]
Ed
It took me two days to get to this point. No parts were cut on a shopsmith. I used an edge guide to rip (circular saw), chopsaw to cut to length, router to make the dados..........kreg jig to do the frames......
Just wanted to point out I'm still alive and still wood working. Was at Iola, WI yesterday with my two remaining brothers, we have not all been in one place at the same time in maybe 35 years so we figured it was time. And it was great! We will have to see if we can manage another outing soon.
Anyway I know things don't happen unless there are pictures.
[ATTACH]25568[/ATTACH]
[ATTACH]25569[/ATTACH]
[ATTACH]25570[/ATTACH]
[ATTACH]25571[/ATTACH]
Ed