Designing and Building a Permanent OPR Station
Posted: Tue Aug 24, 2010 10:10 am
I mentioned in another thread that I wanted to design and build a permanent OPR station. I purchased base castings, way tubes and a tie bar. I already had a carriage and main table. I decided to go with the castings so that I could work both vertical and horizontal.
I have started the design process and will gladly welcome comments and suggestions.
I have decided to shorten the way tubes by 20" which will put the overall length at about 44". I decided to make the cabinet 50" wide, 24" deep and 22" tall. The casters will add about 4 1/8" to the height making the top 26 1/8" above the floor. In vertical mode it will be 11 1/2" from the top of the cabinet to the top of the main work table. This will make the lowest working height in vertical mode about 37 5/8". In horizontal mode the working height will be higher by about 10".
I plan to use MDF for the cabinet with pocket screw and glue joinery. The top will be 2 layers of MDF to make it 1 1/2" thick. I will build drawers with full extension slides for storage.
I am sure I probably overlooked something so feel free to contribute to the design.



I have started the design process and will gladly welcome comments and suggestions.
I have decided to shorten the way tubes by 20" which will put the overall length at about 44". I decided to make the cabinet 50" wide, 24" deep and 22" tall. The casters will add about 4 1/8" to the height making the top 26 1/8" above the floor. In vertical mode it will be 11 1/2" from the top of the cabinet to the top of the main work table. This will make the lowest working height in vertical mode about 37 5/8". In horizontal mode the working height will be higher by about 10".
I plan to use MDF for the cabinet with pocket screw and glue joinery. The top will be 2 layers of MDF to make it 1 1/2" thick. I will build drawers with full extension slides for storage.
I am sure I probably overlooked something so feel free to contribute to the design.


