Post by rbucket »

I'll have a drawing for you a little later today.
MKV 510 (August 1989)
Power Station (2)
Scroll Saw
Band Saw
Edge Sander
Jointer
User avatar
JPG
Platinum Member
Posts: 35600
Joined: Wed Dec 10, 2008 7:42 pm
Location: Lexington, Ky (TAMECAT territory)

Re: power station parts

Post by JPG »

dusty wrote:
dusty wrote:
whsewardiv wrote:does anyone have a power station the are willing to part out or at least dismantle and measure the bushings so i can have them machined
Did you check with billmayo. Reference the immediately preceding post. It sounds like he has what you need.

I'll look tomorrow to see if I can get to the bushings to which you refer without too much difficulty.
I am sorry. I went to the shop this morning to evaluate what needed to be done. I am not willing to do the tear down that would be necessary. There was a time when I had the necessary enthusiasm to do such a tear down but I fear that enthusiasm has eluded me.
I too encountered that 'problem' last night although the lack of sufficient light may have something to do with that.

After looking at the exploded drawing, I 'think' removing the c clip retaining the bushing behind the control lever base will allow fairly simple removal and replacement.

Later today maybe.
╔═══╗
╟JPG ╢
╚═══╝

Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10
E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
rbucket
Silver Member
Posts: 19
Joined: Sun Jul 03, 2016 8:54 am

Re: power station parts

Post by rbucket »

Yep

That's the way. Takes about 30 seconds.

Have mine apart and will have drawing when I get back home in a bout 2 hours.
MKV 510 (August 1989)
Power Station (2)
Scroll Saw
Band Saw
Edge Sander
Jointer
whsewardiv
Gold Member
Posts: 32
Joined: Sat Apr 26, 2014 10:49 pm

Re: power station parts

Post by whsewardiv »

dusty wrote:
dusty wrote:
whsewardiv wrote:does anyone have a power station the are willing to part out or at least dismantle and measure the bushings so i can have them machined
Did you check with billmayo. Reference the immediately preceding post. It sounds like he has what you need.

I'll look tomorrow to see if I can get to the bushings to which you refer without too much difficulty.
I am sorry. I went to the shop this morning to evaluate what needed to be done. I am not willing to do the tear down that would be necessary. There was a time when I had the necessary enthusiasm to do such a tear down but I fear that enthusiasm has eluded me.


thanks for at least looking
whsewardiv
Gold Member
Posts: 32
Joined: Sat Apr 26, 2014 10:49 pm

Re: power station parts

Post by whsewardiv »

rbucket wrote:Yep

That's the way. Takes about 30 seconds.

Have mine apart and will have drawing when I get back home in a bout 2 hours.

thanks i appreciate it
rbucket
Silver Member
Posts: 19
Joined: Sun Jul 03, 2016 8:54 am

Re: power station parts

Post by rbucket »

Here's a crude drawing for the bushing.

All dimensions are actuals off of one of my bushings.

The corners are chamfered with exception of squared opening.
Attachments
Item 44 Power Station Bushing.pdf
(960.66 KiB) Downloaded 721 times
MKV 510 (August 1989)
Power Station (2)
Scroll Saw
Band Saw
Edge Sander
Jointer
rbucket
Silver Member
Posts: 19
Joined: Sun Jul 03, 2016 8:54 am

Re: power station parts

Post by rbucket »

Here's where I'm at today:

I will check with my shop manager and see if we can't re-work a couple of 3/4" deep-well 3/8" sockets. There's enough metal to get the dimensions we need and already have 3/8" square bore.

Already have the sockets; OD and 3/8" are perfect. Test fitted them on one of my machines.

I will let you know...
MKV 510 (August 1989)
Power Station (2)
Scroll Saw
Band Saw
Edge Sander
Jointer
whsewardiv
Gold Member
Posts: 32
Joined: Sat Apr 26, 2014 10:49 pm

Re: power station parts

Post by whsewardiv »

rbucket wrote:Here's where I'm at today:

I will check with my shop manager and see if we can't re-work a couple of 3/4" deep-well 3/8" sockets. There's enough metal to get the dimensions we need and already have 3/8" square bore.

Already have the sockets; OD and 3/8" are perfect. Test fitted them on one of my machines.

I will let you know...

that would be outstanding thank you
User avatar
BuckeyeDennis
Platinum Member
Posts: 3814
Joined: Tue Jul 24, 2012 10:03 pm
Location: Central Ohio

Re: power station parts

Post by BuckeyeDennis »

rbucket wrote:Here's where I'm at today:

I will check with my shop manager and see if we can't re-work a couple of 3/4" deep-well 3/8" sockets. There's enough metal to get the dimensions we need and already have 3/8" square bore.

Already have the sockets; OD and 3/8" are perfect. Test fitted them on one of my machines.

I will let you know...
Very clever!!! :cool:
rbucket
Silver Member
Posts: 19
Joined: Sun Jul 03, 2016 8:54 am

Re: power station parts

Post by rbucket »

Parts are on my desk!

Send me a PM with an address so I can get them to you.
MKV 510 (August 1989)