Bringing it all together

This is a forum for intermediate to advanced woodworkers. Show off your projects or share your ideas.

Moderator: admin

masonsailor2
Platinum Member
Posts: 1564
Joined: Wed Feb 05, 2014 11:57 am
Location: Las Vegas NV

Re: Bringing it all together

Post by masonsailor2 »

Everything is moving along. I got the vertical support stanchion in and the pedestal fitted. Cutting the hole for the plumbing exit got interesting using a 2 1/8” forstner. I had to build a cradle to clamp it to the SS table and then a lot of chiseling. The first coat of finish is on and hopefully only two more coats will do it.
Paul
Attachments
99C3B6A9-CC47-4299-86D6-5D927DF7F707.jpeg
99C3B6A9-CC47-4299-86D6-5D927DF7F707.jpeg (243.51 KiB) Viewed 5228 times
9E68D611-A022-4034-AD1A-2ECF2CB91EDE.jpeg
9E68D611-A022-4034-AD1A-2ECF2CB91EDE.jpeg (124.29 KiB) Viewed 5228 times
9D7B7A79-A9D0-43C6-BDFE-1F5519BD8DB1.jpeg
9D7B7A79-A9D0-43C6-BDFE-1F5519BD8DB1.jpeg (309.89 KiB) Viewed 5228 times
73FFA4D8-CC6E-4FCC-B3BA-2AC43E50451D.jpeg
73FFA4D8-CC6E-4FCC-B3BA-2AC43E50451D.jpeg (177.02 KiB) Viewed 5228 times
283E6217-9008-4238-9EDC-A78579C4B5CF.jpeg
283E6217-9008-4238-9EDC-A78579C4B5CF.jpeg (151.27 KiB) Viewed 5228 times
C31D574F-203E-4C0C-ADFE-72E0AFBBD23E.jpeg
C31D574F-203E-4C0C-ADFE-72E0AFBBD23E.jpeg (234.3 KiB) Viewed 5228 times
masonsailor2
Platinum Member
Posts: 1564
Joined: Wed Feb 05, 2014 11:57 am
Location: Las Vegas NV

Re: Bringing it all together

Post by masonsailor2 »

Finally finished the plumbing with drain and faucet in and working. Also got the threshold done for the transition from the marble to the tile and the glass shelf for the panther statue. Tomorrow the touch up paint and put the door back on and done.
Paul
Attachments
737D2A7A-8121-41AD-8FEF-695FB899E9BA.jpeg
737D2A7A-8121-41AD-8FEF-695FB899E9BA.jpeg (165.74 KiB) Viewed 5188 times
8D6E53A2-E6D6-46AF-B57E-AB901FA19D78.jpeg
8D6E53A2-E6D6-46AF-B57E-AB901FA19D78.jpeg (117.9 KiB) Viewed 5188 times
D6A6F0DE-938F-4D9D-B45F-F1F0B298DE7A.jpeg
D6A6F0DE-938F-4D9D-B45F-F1F0B298DE7A.jpeg (141.46 KiB) Viewed 5188 times
71F008F5-995B-4FD0-9BD5-C7D9E1CF61B1.jpeg
71F008F5-995B-4FD0-9BD5-C7D9E1CF61B1.jpeg (178.75 KiB) Viewed 5188 times
3B4FF23B-5E33-4EF1-B1B8-D5BBC708096D.jpeg
3B4FF23B-5E33-4EF1-B1B8-D5BBC708096D.jpeg (112.37 KiB) Viewed 5188 times
masonsailor2
Platinum Member
Posts: 1564
Joined: Wed Feb 05, 2014 11:57 am
Location: Las Vegas NV

Re: Bringing it all together

Post by masonsailor2 »

So my final task for this room was a door stop. She objected to the 2X4 block I had in there as a door stop for some reason. I was heading over to HD to buy a door stop when it occurred to me that I have a bunch of end scraps of zebrawood so I decided to use up a small piece and turn one. Used a furniture leg pad for the end.
Paul
Attachments
6B82C496-4089-4446-B1C5-1B08E35F3BAA.jpeg
6B82C496-4089-4446-B1C5-1B08E35F3BAA.jpeg (108.27 KiB) Viewed 5091 times
Post Reply