dusty wrote:ED, it seems to me that you have moved the dadoes 3 1/2" to the right of where they were originally located on the test sled.
What am I missing.
The distance from the right slot to the blade.
If the fence/floating table are not moved between second setup piece dado and the first sled dado cut, the sled left edge to dado(blade) dimension will be the same as the setup piece left edge to right dado(slot) dimension. i.e. the sled dado(cut) will be half the miter slot separation distance closer to the sled left edge.
Warning: Excessive thinking about this can lead to headaches!:D
P.S. BTW only the right setup piece dado/runner is 'necessary'. The left one is not actually used when cutting the sled dadoes.