Starting disassembly of the base. It is essentially all formed sheet metal except for the casters assembly and hardware.
Disassembly was mostly straight forward so little is pictured here showing how it was taken apart. The sequence and hardware details are pictured. The hardware serves mainly to help later with reassembly.
The rear panel with the hose port is secured with two plastic thumb screws.
[ATTACH]26557[/ATTACH]
The front panel is secured with the small screws.
[ATTACH]26558[/ATTACH]
All 4 screws for the rear and front panels screw into tinnerman nuts.
[ATTACH]26559[/ATTACH]
The tilt brackets are secured with 2 screws etc. through the top, and one screw etc. through the side at both ends. The flat washers were on top, but the manual places them below. That helps distribute the stress from the nut to the inside sheet metal.
[ATTACH]26560[/ATTACH]
The top is attached to the sides by no less that 16 screws etc. Here is one from one corner.
[ATTACH]26561[/ATTACH]
A PO apparently drilled the two 'extra' holes. Not sure why since they are on the back side.
This thread is linked to from https://forum.shopsmith.com/viewtopic.php?t=11373
Mark VII Base Assembly Breakdown
Moderator: admin
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
Mark VII Base Assembly Breakdown
- Attachments
-
- Rear panel 1.jpg (413.03 KiB) Viewed 3149 times
-
- front panel 2.jpg (387.1 KiB) Viewed 3148 times
-
- panel tinnerman clip 3.jpg (617.23 KiB) Viewed 3150 times
-
- tilt bracket 4.jpg (671.08 KiB) Viewed 3148 times
-
- top screws 5.jpg (748.25 KiB) Viewed 3149 times
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
The vertical clamp hardware inside is missing a washer. It does not work well without it.
[ATTACH]26562[/ATTACH]
The clamp and hardware. The nut seems to be a jamming thread nut which makes sense.
[ATTACH]26563[/ATTACH]
The vertical sides are secured by three screws at each corner to the bottom rails.
[ATTACH]26564[/ATTACH]
I left one screw in each corner until the bottom rails were ready to be removed.
[ATTACH]26565[/ATTACH]
The endcaps were the reason for leaving the sides attached. I feared the small screws might be stubborn to remove.
[ATTACH]26566[/ATTACH]
[ATTACH]26562[/ATTACH]
The clamp and hardware. The nut seems to be a jamming thread nut which makes sense.
[ATTACH]26563[/ATTACH]
The vertical sides are secured by three screws at each corner to the bottom rails.
[ATTACH]26564[/ATTACH]
I left one screw in each corner until the bottom rails were ready to be removed.
[ATTACH]26565[/ATTACH]
The endcaps were the reason for leaving the sides attached. I feared the small screws might be stubborn to remove.
[ATTACH]26566[/ATTACH]
- Attachments
-
- clamp screw inside 6.jpg (767.23 KiB) Viewed 3151 times
-
- clamp 7.jpg (820.43 KiB) Viewed 3148 times
-
- vertical corner inside 8.jpg (743.69 KiB) Viewed 3145 times
-
- vertical corner screws 9.jpg (760.89 KiB) Viewed 3145 times
-
- cap screws b4 10.jpg (911.78 KiB) Viewed 3145 times
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
They came out fairly easily.
[ATTACH]26567[/ATTACH]
The vertical support screws had jam nuts which allowed height adjustment.
[ATTACH]26568[/ATTACH]
Not much new here!
[ATTACH]26569[/ATTACH]
Foot pedal off.
[ATTACH]26570[/ATTACH]
Well this is different.
[ATTACH]26571[/ATTACH]
[ATTACH]26567[/ATTACH]
The vertical support screws had jam nuts which allowed height adjustment.
[ATTACH]26568[/ATTACH]
Not much new here!
[ATTACH]26569[/ATTACH]
Foot pedal off.
[ATTACH]26570[/ATTACH]
Well this is different.
[ATTACH]26571[/ATTACH]
- Attachments
-
- cap screw 11.jpg (823.66 KiB) Viewed 3143 times
-
- vertical stop support adjusting screws 12.jpg (877.27 KiB) Viewed 3142 times
-
- a familiar task 13.jpg (835.13 KiB) Viewed 3137 times
-
- foot lever off 14.jpg (832.12 KiB) Viewed 3137 times
-
- different 4 sure 15.jpg (677.72 KiB) Viewed 3133 times
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
Six screws attach both the caster base and the end cap to the bottom rails.
[ATTACH]26573[/ATTACH]
Six tinnerman clips underneath
[ATTACH]26574[/ATTACH]
[ATTACH]26575[/ATTACH]
The caster retains the piston in the base.
[ATTACH]26576[/ATTACH]
I anticipated getting the cams all the way across the shaft would be a problem. Fortunately that was not the case(a little stubborn, but not difficult).
Notice the set screw is a half dog that goes into a shallow hole in the shaft. Set screws? Where have I seen that before?
[ATTACH]26577[/ATTACH]
I initially considered replacing the 'top hat' retainer on the end of the shaft, but now think that unnecessary.
[ATTACH]26573[/ATTACH]
Six tinnerman clips underneath
[ATTACH]26574[/ATTACH]
[ATTACH]26575[/ATTACH]
The caster retains the piston in the base.
[ATTACH]26576[/ATTACH]
I anticipated getting the cams all the way across the shaft would be a problem. Fortunately that was not the case(a little stubborn, but not difficult).
Notice the set screw is a half dog that goes into a shallow hole in the shaft. Set screws? Where have I seen that before?
[ATTACH]26577[/ATTACH]
I initially considered replacing the 'top hat' retainer on the end of the shaft, but now think that unnecessary.
- Attachments
-
- 6 screws 16.jpg (664.47 KiB) Viewed 3112 times
-
- 6 clips 17.jpg (747.9 KiB) Viewed 3113 times
-
- clips n caster 18.jpg (755.32 KiB) Viewed 3112 times
-
- caster secures cam 19.jpg (761.56 KiB) Viewed 3111 times
-
- cam hd set screw shaft 20.jpg (427.03 KiB) Viewed 3110 times
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
- JPG
- Platinum Member
- Posts: 35600
- Joined: Wed Dec 10, 2008 7:42 pm
- Location: Lexington, Ky (TAMECAT territory)
The worst rust is on the bottom edge of the end caps. It is not all that bad there! Not sure it is visible on this pix.
[ATTACH]26578[/ATTACH]
Last those 4 screws attaching the vertical sides are removed and the bottom rails removed.
[ATTACH]26579[/ATTACH]
Having the vertical sides raise the bottom rails off the ground was a great benefit.
I was initially concerned at the ability of the end caps to hold it all together during disassembly of the casters etc., but with those 6 screws underneath, that concern was not justified.
This concludes breakdown except for the 'correct' quill.
[ATTACH]26578[/ATTACH]
Last those 4 screws attaching the vertical sides are removed and the bottom rails removed.
[ATTACH]26579[/ATTACH]
Having the vertical sides raise the bottom rails off the ground was a great benefit.
I was initially concerned at the ability of the end caps to hold it all together during disassembly of the casters etc., but with those 6 screws underneath, that concern was not justified.
This concludes breakdown except for the 'correct' quill.
- Attachments
-
- endcaps worst rust 21.jpg (612.94 KiB) Viewed 3110 times
-
- last base rail 22.jpg (493.72 KiB) Viewed 3110 times
╔═══╗
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange
╟JPG ╢
╚═══╝
Goldie(Bought New SN 377425)/4" jointer/6" beltsander/12" planer/stripsander/bandsaw/powerstation /Scroll saw/Jig saw /Craftsman 10" ras/Craftsman 6" thicknessplaner/ Dayton10"tablesaw(restoredfromneighborstrashpile)/ Mark VII restoration in 'progress'/ 10E[/size](SN E3779) restoration in progress, a 510 on the back burner and a growing pile of items to be eventually returned to useful life. - aka Red Grange