I said that the end casting holes were just clearance holes and that the tube position position was determined by the bosses inside the casting in this thread and you dismissed it.dusty wrote:JPG, You made a statement earlier in this post that I thought was incorrect. I am here now to tell you that I was wrong. The Tube Tie Down does not force the Bench Tubes outward until they contact the holes in the castings. The ribs, of which you spoke, establish the lateral limit.
This image, probably in addition to some you posted, show the ribs on the sides of the Bench Tubes. It also shows that the through holes are just a little bit larger than the tubes.
I am now ready for my Dual Tilt Kit. To reduce weight, I dropped the motor pan, removed it and the motor, removeds the headstock and carriage and removed the Base Arm Assembly from one end of the Tubes. The other Base Arm Assembly will come off when I am ready to install the new ones.
http://www.shopsmith.com/ss_forum/viewt ... 15#p210315
Thanks JPG for reiterating what was said before.